Tuesday, June 26, 2007

6 Days, Carpet, Lights

I had lunch with Bro. Kevin today. Things are rapidly coming together. He had just come from meeting with the electrician to choose the track lighting for the Upper Room Cafe. That should be installed shortly.

Eck called Kevin today and asked if he could get some of the Youth to come and help prepare the floor for laying carpet tomorrow.

We are really getting down to the final parts of this building. God is so good! Thank you Eck and Kevin for letting God use you guys so much!

Friday, June 22, 2007

9 Days, Upper Room Cafe, Gym Floor

Only 9 more days until we are scheduled to open the doors. Things have appeard to go smoothly. I pray God bless Eckels Evans, Newt Robertson, all the crew and and all the others that have worked tirelessly to get us this far. God is good!

Kevin told me today the ceiling tiles are installed in the Upper Room Cafe. Those tiles will be painted. That should complete the ceiling of the Cafe.

It appears as though the gym floor will not be in place for the opening of the ARC. There are some issues that must be resolved with the roof of the building that have precluded us from beginning to install the floor. Those issues are being addressed. As soon as they are resolved I am certain the floor will be installed.

Tuesday, June 19, 2007

12 Days, Lights and a Drive Through


The framework for the awning over the drive and up the stairs has been erected. Shortly the skin will be attached and I will be able to drop my wife and child off at the ARC without fear of them getting wet!

The electric company has also installed lighting on the electricity poles around the parking lot. I have not been by after hours to see if they are indeed hooked into the grid. I shall do so and report on that shortly.

I will bring an update on the gym floor tomorrow.

Sunday, June 17, 2007

14 Days, Preparing the Floor


Here you can see the kit we have for testing the moisture that is still in the concrete. The concrete must be dry to a certain point before we can install the SportGrain Plus gym floor. Here is how this kit works:

When ready to check the moisture in the concrete, weigh the dish that contains the white pellets (left) and record that weight on the lid.

Seal the dish in with the plastic container while the dish is on the concrete.

After a specified period, reweigh the contents of the dish and record that weight on the lid. A calculation based on the difference in beginning and ending weight will tell how much moisture the concrete still holds. As a geek, I find this to be a very cool method for determining the amount of water left in the slab.

When we get the results I will post them here. When the concrete is ready, the floor should start going down!

God is good!

Thursday, June 14, 2007

18 Days, A/C, Landscaping,

Only 18 more days before Cleary's ARC opens! Stopping in today I could see many advances. The air conditioning was turned on and running. The upper floor was not as warm even on this near 100 degree day. I took several photos today which I will add to Flickr tomorrow. You will see the checkerboard tile in the Upper Room Cafe. Very cool with a wavy wall.

The was quite a bit of the grid work complete for the hanging tile ceiling all over the building. Some of that ceiling was installed in places while other rooms had the lights in place but not the ceiling tiles.

In the front of the building the forms for the steps from the upper parking strip are in place and landscaping has been laid.

Thursday, June 7, 2007

24 Days, Inspections, Power

In just over three weeks we will be opening the doors to the ARC. With that little bit of time left Eck and his crew are really working hard. The inspectors came and gave a thumbs up to the electrical inspection. The paperwork has been submitted and should be filed shortly. We are hoping to turn on power tomorrow.

God is so good to Cleary Baptist Church.

Tuesday, June 5, 2007

26 Days, Paint, Lights, A/C, Banner

With 26 days left before launching the ARC I have several things to report.

The inside of the building is largely painted. While there may be a few things to touch up most of the paint is on the wall and dry. This allows us to begin hanging the grid work for the lights. That is the next thing going up.

Later this week the air conditioning will be finished up and turned on. We need to have the A/C on for several days to remove the humidity in order for the gym floor installation to begin. It is looking like the gym floor is one of the final pieces to the puzzle.

We have a banner that will be hung outside telling all about this blog. If you are a guest reading for the first time because of the banner, "Welcome!" And thank you for stopping in. If you have any questions, please feel free to drop a line. You can also visit our church website at http://clearybaptist.org.